STATUS

Complete

OWNER

City of Highland Park

ARCHITECT

Christopher B. Burke Engineering

The Highland Park Bridge Maintenance program consisted of bridge repairs to three bridges in Highland Park, IL. Work on the Linden Ave. bridge consisted of the replacement of bearings, resurfacing of the HMA surface, waterproofing of the deck, and the replacement of expansion joints. The Cary Ave. pedestrian bridge was removed and replaced. Special provisions were made for the historical hand rail on this pedestrian bridge that was also removed and reinstalled. Structural concrete repairs were made to the Roger Williams bridge. Work also included full depth deck patches, waterproofing, and HMA resurfacing.