STATUS

Complete

OWNER

Amtrak

ARCHITECT

Collins Engineering

This project (performed as a Subcontractor) involved the removal of the existing corrugated metal paneling on the east side of the machine room, erection of a temporary work platform to facilitate motor removal, the removal and reinstallation of both the east and west motors, the installation of temporary shafts, and the installation of a temporary sidewall